Minister of Infrastructure and Urban Development Collins Nzovu inspected the 321-kilometer Lusaka-Ndola dual carriageway on Wednesday, using the site to reaffirm the government’s reliance on public-private partnerships (PPPs) for national development. According to Lusaka Times, Nzovu stated that the progress observed on the ground serves as evidence of the efficacy of collaborations between the state and private entities. He emphasized that the project represents a significant shift from a period characterized by economic contraction and halted infrastructure works to the current administration’s strategy under President Hakainde Hichilema.
The Lusaka-Ndola corridor, constructed at an estimated cost of US$650 million, is being managed by Moic-LN Consortium Limited. Jane Kang, the consortium’s assistant project manager, informed the minister that construction is currently over 80 percent complete. She confirmed that the consortium aims to finalize the project by the first quarter of 2027. Nzovu expressed satisfaction with the quality of the works, noting that the concessionaire is adhering to agreed specifications. To ensure compliance, the Road Development Agency (RDA) has engaged an independent consultant to monitor construction against Zambian standards.
Nzovu explained that the government retains the authority to mandate repairs if quality standards are not met. He noted that the concessionaire has a long-term obligation to maintain the roads, which aligns their interests with ensuring high-quality initial construction. The minister also highlighted the economic benefits of the expansion, stating that improved transportation has made business more attractive and accelerated economic activity. Motorists have reportedly welcomed the upgrades, which are designed to handle higher traffic volumes between the capital and the Copperbelt province.
Looking ahead, Nzovu announced that additional dual carriageway projects are in the pipeline, including routes connecting Lusaka to Livingstone, as well as corridors in Mongu and Chipata. He clarified that the PPP model will also extend to township roads. During the inspection at the Kapiri bypass, the minister warned against encroachment on the road reserve, stipulating that no private structures can be built within 50 meters of the boundary. Nelson Chuma, the RDA’s chief executive officer, reinforced this stance, stating that such encroachments hinder future road expansion. Meanwhile, local leaders in Chibombo District have praised the government for transforming the area through these infrastructure improvements.
